Your project has 4 storefronts for different branches. Everyday at 4.00 am runs a job to import inventories, master catalog and storefronts for each of those sites. You’re in charge of job configuration, given this information what should be the best approach to achieve it?

Your project has 4 storefronts for different branches. Everyday at 4.00 am runs a job to import inventories, master catalog and storefronts for each of those sites. You’re in charge of job configuration, given this information what should be the best approach to achieve it?
A . First flow with organization scope to import master catalog, another flow with 4 steps to import each storefront catalog with site scope and in parallel inventory import with organization scope.
B . None of these answers are correct
C . 2 flows needed. First one to import master catalog with organization scope and in parallel import storefronts with site scope and second flow to import the inventory with organization scope.
D . 3 flows are needed. First master catalog with organization scope. Second flow is to import storefront catalogs with site scope and last to import inventory with organization scope.

Answer: A

Subscribe
Notify of
guest
0 Comments
Inline Feedbacks
View all comments