You use a status profile in the quality info record in procurement, under which circumstances does the system create an inspection lot of the next supplier relationship during gr processing?
A . When the vendor attains an A in the vendor Evolution
B. When the usage decision for the previous inspection lot was rej
C. When there is an open inspection lot for the current supplier relationship status
D. When the UD for the previous inspection lot was accepted
Answer: D
Latest C_TS414_2021 Dumps Valid Version with 80 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund