You run an assessment cycle for cost centers, but no postings are made because the posting period is NOT open. Against which period interval is the check being made?
A . First interval 3, then interval 2 if interval 3 is not maintained
B . First interval 3, then intervals 1&2 if interval 3 is not maintained
C . Only interval 3, no other intervals checked if interval 3 is not maintained
D . First interval 3, then interval 1 if interval 3 is not maintained
Answer: C
Latest P_S4FIN_2023 Dumps Valid Version with 80 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund