Why?
A backup job has been configured to keep three incremental restore points and a synthetic full backup each Sunday. More restore points are present on disk than what was configured in the job.
Why?
A . The old restore points will be deleted after the new restore chain meets the retention policy
B . Per VM backup files are enabled in the repository
C . The other restore points are weekly full backups, this is expected
D . You should configure the synthetic full backup to be performed on Mondays instead
Answer: C
Explanation:
Reference: https://www.veeam.com/kb1990
Latest VMCE2020 Dumps Valid Version with 50 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund
Subscribe
Login
0 Comments
Inline Feedbacks
View all comments