Who is responsible for the System Architecture of a Product being developed using Scrum? (choose the best answer)
A . The Corporate Architect.
B. The Architect chosen by the Scrum Team.
C. The Software Architect.
D. The Developers.
Answer: D
Latest PSD-I Dumps Valid Version with 166 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund