Exam4Training

Who is accountable for tracking the remaining work toward the Sprint Goal? (Choose the best answer.)

Who is accountable for tracking the remaining work toward the Sprint Goal? (Choose the best answer.)
A . The Developers.
B . The Scrum Master.
C . The Product Owner.
D . The Project Manager.

Answer: A

Latest PSM I Dumps Valid Version with 197 Q&As

Latest And Valid Q&A | Instant Download | Once Fail, Full Refund

Exit mobile version