Who is accountable for clearly expressing Product Backlog items? (Choose the best answer.)
A . The business analyst who represents the Product Owner.
B . The Product Owner.
C . The Scrum Master, or the Scrum Master may have the Developers do it.
D . The Scrum Master.
Answer: B
Latest PSM I Dumps Valid Version with 197 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund