Exam4Training

Which two steps should the architect include within the implementation plan to ensure a successful deployment of vRealize Automation?

A cloud architect is writing an implementation plan for deployment of a clustered vRealize Automation deployment that will use a third-party load balancer.

Which two steps should the architect include within the implementation plan to ensure a successful deployment of vRealize Automation? (Choose two.)
A . Disable all secondary nodes from the load balancer pools
B . Create and configure the monitoring of vRealize Automation and vRealize Orchestrator
C . Ensure all the SAN certificates for vRealize Suite are available
D . Enable all non-primary nodes on the load balancer
E . Turn off the health monitors or change them temporarily to default to ICMP and ensure traffic is still forwarding to the primary node

Answer: B,C

Explanation:

Reference: https://docs.vmware.com/en/VMware-Validated-Design/6.1/sddc-deployment-of-cloud-operationsand-automation-in-the-first-region/GUID-18A6AEF4-2EF7-47B2-B421-D34156344652.html

Latest 3V0-32.21 Dumps Valid Version with 60 Q&As

Latest And Valid Q&A | Instant Download | Once Fail, Full Refund

Exit mobile version