An administrator needs to relocate an AHV cluster to a new datacenter during a maintenance window. The cluster will use the same IPs in the new datacenter.
Which two steps should be taken to prepare for this task? (Choose two.)
A . Reconfigure IPMI for the new datacenter
B. Shut down all user VMs in the cluster
C. Relocate the linked LDAP server
D. Stop all Nutanix Files clusters
Answer: B,D