Which two steps should be taken to prepare for this task?

An administrator needs to relocate an AHV cluster to a new datacenter during a maintenance window. The cluster will use the same IPs in the new datacenter.

Which two steps should be taken to prepare for this task? (Choose two.)
A . Stop all Nutanix Files clusters
B. Relocate the linked LDAP servers
C. Shut down all user VMs in the cluster
D. Reconfigure IPMI for the new datacenter

Answer: A C

Explanation:

Reference: https://next.nutanix.com/installation-configuration-23/physical-relocation-of-nutanix-clusters-38403