Which two should be considered when planning to expand the cluster?
An implementation engineer is tasked with expanding an 8-node VxRail E560 cluster with an S570 node. The cluster has been configured with 1 GbE networking.
Which two should be considered when planning to expand the cluster? (Select 2)
A . Node limit has been reached on the cluster
B . AMD and Intel based nodes cannot be mixed
C . E Series nodes require more capacity before expansion
D . All nodes in the cluster must be the identical series
Answer: AB
Latest D-VXR-DY-01 Dumps Valid Version with 344 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund
Subscribe
Login
0 Comments
Inline Feedbacks
View all comments