Upon checking the latency goal under vSAN performance diagnostics, the vSAN Administrator sees this message displayed:

The increase in latency in the vSAN stack might be beyond expected limits.

Which two root causes can be identified to help remediate the issue? (Choose two.)
A . vSAN VMKemel portgroup is configured with the “Route based on IP hash” teaming policy
B . vSAN encryption is enabled
C . Large packet losses and retransmissions on the network layer
D . Incorrect sizing of the disk groups capacity disks
E . One or more disk groups are congested

Answer: C, E

Explanation:

Reference: https://kb.vmware.com/s/article/2150018