You need to configure the system for plastic operations.
Which two parts should be manually reported as finished? Each correct answer presents part of the solution. NOTE: Each correct selection is worth one point.
A . unmachined plastic pieces
B. mold tooling
C. machined plastic pieces
D. excess plastic
Answer: AC
Latest MB-335 Dumps Valid Version with 80 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund