Which two parts should be manually reported as finished?

You need to configure the system for plastic operations.

Which two parts should be manually reported as finished? Each correct answer presents part of the solution. NOTE: Each correct selection is worth one point.
A . unmachined plastic pieces
B . mold tooling
C . machined plastic pieces
D . excess plastic

Answer: A,C