Universal Containers has a large volume of cancellations occurring on their Work Orders.
The COO wants to manage Work Order cancellations and subsequentfollow-ups.
Which two options should a Consultant recommend? (Choose two)
A . Change the Work Order with a closed status of "Cancelled".
B . Address
C . Re-use the existing Work Order for the follow-up.
D . Create a child Work Order for the follow-upWork Order
E . Change the Work Order with a status of "New".
Answer: A,D
Latest Heroku Architecture Designer Dumps Valid Version with 185 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund