Which two options can you use?

A company produces paints and assembles bicycle frames.

You must account for paint drying time before assembly operations can begin.

You need to set up the operation to encompass queue times.

Which two options can you use? Each correct answer presents part of the solution. NOTE: Each correct selection is worth one point.
A . Build capabilities for each resource related to color.
B . Enter a value in the queue time after eld for the painting operation.
C . Enter a value in the transit time on the painting operation.
D . Make a resource group for each size and color and assign that group to the operation.
E . Enter a value in the queue time before eld for the assembly operation.

Answer: BE