Which two operations should be performed to accomplish this task?

You have an AFF A220 cluster connected to a dual fabric topology. You must ensure that SAN hosts do not lose access to LUNs during unplanned failures.

Which two operations should be performed to accomplish this task? (Choose two.)
A . Manually set all LUNs offline.
B . Manually set all FC LIFs on a single node to "down".
C . Turn the power off on one disk shelf.
D . Initiate a reboot of one Fibre Channel switch.

Answer: BD

Latest NS0-520 Dumps Valid Version with 334 Q&As

Latest And Valid Q&A | Instant Download | Once Fail, Full Refund

Subscribe
Notify of
guest
0 Comments
Inline Feedbacks
View all comments