Exam4Training

Which two of the listed statements are business requirements?

During a transformation project kick-off meeting, an architect highlights specific areas on which to focus while developing the new conceptual design.

Which two of the listed statements are business requirements? (Choose two.)
A . The project should use the existing storage devices within the data center
B . Sites must support a network latency of less than 12 ms round-trip time (RTT)
C . The solution must allow data replication between sites
D . There is no budget specifically assigned for disaster recovery
E . There must not be a single point of failure for the virtual infrastructure

Answer: C,E

Latest 3V0-21.21 Dumps Valid Version with 88 Q&As

Latest And Valid Q&A | Instant Download | Once Fail, Full Refund

Exit mobile version