Which two events need to happen when deploying to a production org? Choose 2 answers
A . All triggers must have at least 1% test coverage.
B . All Apex code must have at least 75% test coverage.
C . All triggers must have at least 75% test coverage.
D . All test and triggers must have at least 75% test coverage combined
Answer: AB
Latest PDI Dumps Valid Version with 191 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund