Which two configurations need to be set up?
Universal Containers schedules jobs that require multiple steps when on-site. They would like to add a new status to the existing status flow.
Which two configurations need to be set up? Choose 2 answers.
A . Add the allowed Status Transitions in Field Service Settings.
B . Add new Status to the Work Order
C . Add the Status Transitions to the Technicians’ Profile.
D . Add new Status to the Service Appointment.
Answer: C,D
Latest FSL-201 Dumps Valid Version with 105 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund
Subscribe
Login
0 Comments
Inline Feedbacks
View all comments