Which two components should you verify?
You need to resolve the document processing issue.
Which two components should you verify? Each correct answer presents part of the solution. NOTE: Each correct selection is worth one point.
A . The document processor flow is turned on.
B . The email importer flow is set to include attachments.
C . The document automation validator flow includes business logic
D . The shared mailbox is set in the email importer flow.
Answer: A, D
Latest PL-500 Dumps Valid Version with 43 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund
Subscribe
Login
0 Comments
Inline Feedbacks
View all comments