Which two are true about the Risk badge in vRealize Operations? (Choose two.)
Which two are true about the Risk badge in vRealize Operations? (Choose two.)
A . The Risk badge indicates potential future problems that may degrade the performance of the system.
B . Risks may require attention in the near future.
C . The Risk badge indicates problems that are degrading performance of the system.
D . Risks require attention now to correct system performance problems.
Answer: A,B