Which two are true about the Risk badge in vRealize Operations? (Choose two.)

Which two are true about the Risk badge in vRealize Operations? (Choose two.)
A . The Risk badge indicates potential future problems that may degrade the performance of the system.
B . Risks may require attention in the near future.
C . The Risk badge indicates problems that are degrading performance of the system.
D . Risks require attention now to correct system performance problems.

Answer: A,B

Latest 2V0-602 Dumps Valid Version with 370 Q&As

Latest And Valid Q&A | Instant Download | Once Fail, Full Refund

Subscribe
Notify of
guest
0 Comments
Inline Feedbacks
View all comments