You are the production planner for a manufacturing company.
After running operations scheduling for a production order, the following error message displays:
You need to identify the cause of the error.
Which two actions should you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.
A . Navigate to the work calendar and view working times. Validate that there are working days created in the scheduled period.
B . Review the calendar for the resource to determine if it is expired.
C . Review the available resources for Operation 10. Navigate to the Resource form and validate whether there is a calendar assigned
D . Review the resource group assigned to Operation 10. Check to see if there is a calendar assigned and if the calendar is expired.
Answer: B,C
Latest MB-320 Dumps Valid Version with 141 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund