Which two actions should the administrator take when designing the Volume Group?
An administrator needs to deploy an application with a large amount of data connected via Nutanix Volumes.
Which two actions should the administrator take when designing the Volume Group? (Choose two.)
A . Use multiple subnets for iSCSI traffic
B . Enable RSS (Receive Side Scaling)
C . Enable thick provisioning on the Volume Group(s)
D . Distribute workload across multiple virtual disks
Answer: B,D
Latest NCS-Core Dumps Valid Version with 191 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund
Subscribe
Login
0 Comments
Inline Feedbacks
View all comments