Which three steps will achieve this objective?
An administrator wants to ensure that any virtual machine added to a certain port group always has sufficient network resources. Network I/O Control version 3 has been enabled on the Distributed Switch.
Which three steps will achieve this objective? (Choose three.)
A . Reserve bandwidth for virtual machine system traffic on the Distributed Switch Port Group.
B . Edit the virtual machine’s Resource settings and set a reservation for virtual machine system traffic.
C . Create a Network Resource Pool on the Distributed Switch and set a reservation quota.
D . Reserve bandwidth for virtual machine system traffic on the Distributed Switch.
E . Add the Network Resource Pool on the Distributed Switch Port Group.
Answer: C,D,E
Latest 2V0-622 Dumps Valid Version with 235 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund