Which three steps should the administrator perform next?
HOTSPOT
A system administrator needs to shut down an AHV node in a Nutanix cluster without causing service disruption. The administrator checks data resiliency and verifies that the cluster can tolerate a node down.
Which three steps should the administrator perform next? (Choose three.)
Answer:
Explanation:
1 allow vms
2 sd CVM
3 sd node
Latest NCS-Core Dumps Valid Version with 191 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund
Subscribe
Login
0 Comments
Inline Feedbacks
View all comments