Which three steps are required to accomplish this goal?
An engineer must ensure that Cisco ACI flushes the appropriate endpoints when a topology change notification message is received in an MST domain.
Which three steps are required to accomplish this goal? (Choose three.)
A . Enable the BPDU interface controls under the spanning tree interface policy.
B. Configure a new STP interface policy.
C. Bind the spanning tree policy to the switch policy group.
D. Associate the STP interface policy to the appropriate interface policy group.
E. Create a new region policy under the spanning tree policy.
F. Map VLAN range to MAT instance number.
Answer: A,B,D
Latest 300-620 Dumps Valid Version with 78 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund
Subscribe
Login
0 Comments
Inline Feedbacks
View all comments