Which three components should you verify?

You are verifying multipathing from the host to the storage controller.

Which three components should you verify? (Choose three.)
A . Verify that all switch ports connected to the hosts and storage devices are online using the vendor’s GUI.
B.Verify that both FC HBA ports in the host are online using the HBA vendor’s GUI.
C.Verify that the FC HBAs WWNN’s are in the igroup in the SVM.
D.Verify that the SVM’s LIFs being used for multipathing are attached to the correct same physical FC port.
E.Verify that the storage controller FC target ports status are online with the switch port showing the FC switch to which they are connected.

Answer: ABE

Latest NS0-520 Dumps Valid Version with 334 Q&As

Latest And Valid Q&A | Instant Download | Once Fail, Full Refund

Subscribe
Notify of
guest
0 Comments
Inline Feedbacks
View all comments