Exam4Training

Which three components are recommended to complete the survey?

A network engineer is preparing for an office site survey with a height of 2.5 meters.

Which three components are recommended to complete the survey? (Choose three.)
A . Use a battery pack to power APs
B . Use a drawing of the office space to draw AP and client placements.
C . Use DoS attack on APs while measuring the throughput.
D . Use APs with directional antennas.
E . Use APs with external antennas.
F . Use APs with built-in antennas.

Answer: ABF

Latest 300-425 Dumps Valid Version with 100 Q&As

Latest And Valid Q&A | Instant Download | Once Fail, Full Refund

Exit mobile version