You have a Cisco FabricPath network. You must implement Vpc+ for a downstream switch.
Which three actions should you preform? (Choose three)
A . Configure the downstream switch to use PAgP on EtherChannel.
B . Configure the switch ID on the peer switches.
C . Establish a peer link between the peer switches.
D . Configure the upstream switch to use PAgP on EtherChannel.
E . Configure a peer keepalive between the peer switches.
F . Connect the downstream switch to a 10Gb port.
Answer: BEF