Which three actions should you perform in sequence?

DRAG DROP

You are a Dynamics 365 Finance and Operations developer.

You have a report in an existing model that connects with the following objects:

✑ in-memory table

✑ data provider class

✑ controller class

✑ contract class

The report is locked for modifications.

You need to create an extension of the in-memory table in a model and you add the new field to the extension.

Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Answer: