DRAG DROP
You need to create an extension of the table and perform a build and synchronize the newly extended table.
Which three actions should you perform in sequence? to answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
Answer:
Latest MB-500 Dumps Valid Version with 117 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund