You need to set up the metal production route and BOM.
Which three actions should you perform? Each correct answer presents part of the solution. NOTE: Each correct selection is worth one point.
A . Set the operation route type as Standard.
B. Set the input warehouse on the resource to the vendor warehouse.
C. Set the operation route type as Vendor.
D. Set all BOM lines warehouse to the production warehouse.
E. Set all the BOM lines to resource consumption.
Answer: BCD