A WELL AP is monitoring the ongoing submission of documents required for a WELL Certified project.
Which strategy should the WELL AP use to ensure the requirements are met?
A . Collect the appropriate documents annually and submit them through email
B . Collect and submit all required documents at the 18 and 36 month marks of certification
C . Collect and submit all required documents within 15 months of certification and every 12 months thereafter
D . Develop a schedule with the project owner to collect the right information on an ongoing basis and submit every three years through the WELL digital platform
Answer: D
Explanation:
Feature Z01 requires projects to submit documentation and verification of their WELL performance every three years through the WELL digital platform. This ensures that the project maintains its WELL certification and continues to meet the WELL standards. The WELL AP should develop a schedule with the project owner to collect the right information on an ongoing basis and submit it every three years through the WELL digital platform. The other options are not consistent with the WELL v2 requirements.
Reference: = WELL v2 Feature Z01: Documentation and Verification, WELL Tip: Annual reporting and recertification of WELL Certified spaces