HOTSPOT
An administrator needs to shut down an AHV cluster to relocate hardware. The administrator upgrades NCC and runs health checks.
Which steps should the administrator perform next?
Item instructions: For each procedure, indicate the order in which that procedure must take place to meet the item requirements.
Answer:
Latest NCP-MCI-5.15 Dumps Valid Version with 280 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund