Exam4Training

Which steps are required to set up a total cost term? Note: there are 3 correct answers to this question.

Which steps are required to set up a total cost term? Note: there are 3 correct answers to this question.
A . Create a line item within the event
B. Add eachterm to the event template
C. Set the answer type and acceptable value for all non-numeric terms
D. Access the sourcing Library for a list of approved terms
E. Designate if the term is an adder, subtracter, multiplier, or percentage discount

Answer: A,C,E

Exit mobile version