Which steps are required to set up a total cost term? Note: there are 3 correct answers to this question.
Which steps are required to set up a total cost term? Note: there are 3 correct answers to this question.
A . Create a line item within the event
B . Add each term to the event template
C . Set the answer type and acceptable value for all non-numeric terms
D . Access the sourcing Library for a list of approved terms
E . Designate if the term is an adder, subtracter, multiplier, or percentage discount
Answer: A,C,E