Exam4Training

Which step should the administrator use to initiate the project?

An organization is running a Nutanix Cluster based on AOS 5.10.x and VMware vSphere 6.7.

Currently, the CVM network is segmented and Storage only nodes not present.

A new security project based on NSX is coming. VMware Distributed Virtual Switches are required.

The administrator needs to prepare the environment for the new project.

Which step should the administrator use to initiate the project?
A . Enable Nutanix Flow at the Prism Central Level
B . Manually disable CVM network Segmentation
C . Convert storage only nodes into vSphere nodes
D . Enable Jumbo Frames to accommodate network frames

Answer: B

Explanation:

In preparing for the VMware NSX security project, the administrator should consider the network infrastructure and how the NSX will interact with the existing Nutanix environment. VMware NSX requires the use of VMware Distributed Virtual Switches. In the given scenario, where the CVM (Controller Virtual Machine) network is segmented and storage-only nodes are not present, the key step is to ensure that the network settings are compatible with NSX. Disabling the CVM network segmentation allows for a unified network that supports the requirements of NSX for network virtualization and security, making it the crucial first step before any further NSX-specific configurations are applied.

Reference: Nutanix Bible, Nutanix Community discussions, VMware NSX documentation.

Latest NCS-Core Dumps Valid Version with 191 Q&As

Latest And Valid Q&A | Instant Download | Once Fail, Full Refund

Exit mobile version