Exam4Training

Which step should be taken by the administrator to meet this goal?

A host in the cluster experiences a permanent NIC failure, and the replacement part will not arrive until the next morning. The administrator needs to ensure the availability of the production workload at all times.

Which step should be taken by the administrator to meet this goal?
A . Shut down the production VMs.
B . Perform a live vMotion to another host.
C . Disable the vSAN Service on the VMkernel port.
D . Enter Maintenance Mode with ‘Full Data Migration’

Answer: B

Explanation:

Reference: https://docs.vmware.com/en/VMware-vSphere/6.7/vsan-673-monitoring-troubleshooting-guide.pdf

Latest 5V0-22.21 Dumps Valid Version with 76 Q&As

Latest And Valid Q&A | Instant Download | Once Fail, Full Refund

Exit mobile version