Which statement is true regarding scheduling a reclamation process without impacting client backup in IBM Spectrum Protect?
A . Reclamation should be allowed to happen only by the automatic threshold.
B . Reclamation should be scheduled to start after client backups finish utilizing a durationthat ends before client backups start.
C . Reclamation is only scheduled through an administrative script.
D . Reclamation can only be scheduled through the Operations Center.
Answer: A
Explanation:
Volume reclamation occurs when the reclamation threshold for the container-copy storage pool is less than 100%. However, onsite volumes are not a candidate for reclamation until they are 75% full.
References:http://www-01.ibm.com/support/docview.wss?uid=swg27048653