You are performing a risk assessment for a network design.
Which statement is true in this scenario?
A . Some risks can be safely ignored.
B . The likelihood of a risk occurring should not be considered.
C . A network must be designed for an uptime of five nines.
D . All identified risks must have a mitigation plan in place.
Answer: A
Latest JN0-1101 Dumps Valid Version with 65 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund