An architect is designing a new platform. Existing virtual machines will be migrated to this platform.
The migration process is defined as follows:
– A migration host will be loaded with virtual machines from the old platform.
– The migration host will be added to the desired new cluster.
– Virtual machines compute and storage will be migrated to desired hosts in the new platform.
– The migration host will be removed and added back to the old platform so the process can restart.
The following characteristics are noted:
– A total of 800 virtual machines will be migrated.
– A total of 50 hosts will be available in the new platform.
– The migration host will have four paths to each of 512 connected LUNs.
Which size vCenter Server should be specified for the new platform?
A . Large
B . Small
C . Medium
D . Tiny
Answer: A
Latest 3V0-21.23 Dumps Valid Version with 185 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund