Exam4Training

Which set of scheduler attributes must be used to meet these requirements?

Refer to the exhibit.

An engineer must schedule the firmware upgrade of the Red1 and Red2 leaf switches. The requirement is to keep the upgrade time to the minimum, avoid any service impact, and perform the parallel upgrade.

Which set of scheduler attributes must be used to meet these requirements?

A . Option A
B. Option B
C. Option C
D. Option D

Answer: D

Latest 350-601 Dumps Valid Version with 138 Q&As

Latest And Valid Q&A | Instant Download | Once Fail, Full Refund

Exit mobile version