An engineer must connect a new host to port 1 »’1 on Leaf 101. A Cisco ACI fabric has an MOP policy configured but experience excessive Layer 2 loops. The engineer wants the Cisco ACI fabric to detect and prevent Layer 2 loops m the fabric.
Which set of actions accomplishes these goals’?
A . Option A
B. Option B
C. Option C
D. Option D
Answer: B
Latest 300-620 Dumps Valid Version with 78 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund