You want to trigger in-house production of a semi-finished material before a sales order for the corresponding finished good is received.
Which planning strategy supports the consumption of planned independent requirements for the semi-finished material?
A . Planning with final assembly (40)
B . Production by lot size (30)
C . Planning at assembly level (70)
D . Make-to-order production (20)
Answer: B
Latest C_TS422_2022 Dumps Valid Version with 80 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund