Which periode does the planner define when using the scheduling period in the maintenance plan? choose 1 answer
A . the period in which the system job for scheduling runs
B . the period for which orders are created in advance
C . the period in which a shift of planned dates is allowed
D . the period for which the system generate planned or call dates
Answer: D