Exam4Training

Which part of the process failed?

A company failed to detect a breach of their production system. The breach originated from a legacy system that was originally thought to be decommissioned. It turned out that system was still operating and occasionally connected to the production system for reporting purposes.

Which part of the process failed?
A . DE.CM
B . ID.BE
C . ID.AM
D . PR.DS

Answer: C

Exit mobile version