Exam4Training

Which outcome is expected as a Scrum Team matures? (choose the best answer)

Which outcome is expected as a Scrum Team matures? (choose the best answer)
A . There will be no need for a time boxed Sprint.
B . They will improve their Definition of Done to include more stringent criteria.
C . The Sprint Retrospectives will grow to be longer than 4 hours.
D . A Scrum Master is no longer needed since they are a mature team now.
E . Sprint Reviews will no longer be needed.

Answer: B

Latest PSPO-I Dumps Valid Version with 481 Q&As

Latest And Valid Q&A | Instant Download | Once Fail, Full Refund

Exit mobile version