Your company is running a Process Integration 7.0 system and needs to move to a more recent release.
Which options represent valid strategies? Note: There are 3 correct answers to this question.
A . Upgrade the system directly to PI 7.40
B . Upgrade the system directly to PI 7.50
C . Migrate to a Process Orchestration 7.50 system
D . Add a PI 7.50 decentral adapter engine
E . Upgrade the system directly to PI 7.50 changing to dual usage type
Answer: A,B,C
Latest C_PO_7513 Dumps Valid Version with 227 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund