In your plant, MRP is activated .
Which options do you have to exclude a material from the MRP run? Note: There are 2 correct answers to this question.
A . Use a specific material status.
B . Use a specific MRP controller.
C . Use a specific material group
D . Use a specific MRP type.
Answer: B,D